Skip to main content

Combined Stormwater and Wastewater Discharge to Gastineau Channel on September 26

September 27, 2025

The City & Borough of Juneau Utilities Division reports that a Combined Sewer Overflow (CSO) event occurred at the Outer Drive Pump Station in Downtown Juneau during the heavy precipitation on Friday, September 26, 2025. The event resulted in a discharge of approximately 80,000 gallons of combined wastewater and stormwater into the Gastineau Channel between around 8 p.m. and 11 p.m. on Friday evening. Environmental impacts from this discharge are expected to be minimal due to the short duration of the event and the dilute nature of the discharge.

The discharge was caused by an unexpected low pressure weather system with heavy precipitation that temporarily overwhelmed the Outer Drive (OD) wastewater pump station during a sensitive construction action.  The OD station is currently undergoing a major reconstruction and upgrade, due to be completed within the month.  Once completed, the upgrades to the OD station will serve to prevent this type of event from recurring. This project is part of a comprehensive program to replace the Utility’s aging and antiquated infrastructure.

For more information, contact CBJ’s Water Utility Office at 586-0393.

Categories:
Utilities

Related News

Utility worker monitors while a fire hydrant is flushed with water.

System-Wide Water Line Flushing to Begin This Week

Beginning the week of September 1, 2026, the City and Borough of Juneau Water Utility will begin flushing the water…
Read Story

Clean Water, Improved Infrastructure, Detailed in Juneau’s 2025 Water Quality Report

The City and Borough of Juneau (CBJ) is pleased to share the positive results found in this year’s annual water quality report. The report, which…
Read Story

Water and Sewer Utility Rates Increase Today

Starting today, July 1, the water and sewer utility rate will increase by 5 percent. Utility users should expect changes…
Read Story